Currently in the design phase, mass timber will be utilized for the structure of the warehouse addition and incorporated into the existing building as a wrap-around exterior canopy structure, providing cover from the elements for both the front entrance and main loading dock. The duality of the exterior and interior wood elements will connect the two interventions across the existing building, ensuring the final built form reads as a cohesive whole.
STRUCTURE Mass Timber (New)
Steel (Existing)
SCALE. 1 story
FLOOR AREA 7,375 ft2 (New)
6,470 ft2 (Existing)
CLIENT Bloomington Developments
MASS TIMBER Nordic
STRUCTURAL Anthony Spick
MECHANICAL TBD
ELECTRICAL TBD
CIVIL Tulloch
GEOTECHNICAL Englobe
SERVICES Record Drawings
3D Scans
Site Plan Approval
Conceptual Design
Rendering Package
Building Permit