Algorithmic costing + design with spatial statistical models

We build models that link a project's geometry to approximate costs. Change a storey height, grid or building position, and the model shows how the cost moves while the design is still easy to change.

New · By invitation

Pre-Eng Building Configurator

Enter a few variables, such as size, bay spacing, clear height, roof slope, doors and location, and the configurator synthesizes a complete high-level model of a pre-engineered glulam building with rough cost figures, and an equivalent steel building for 1:1 comparison. Everything updates live, so you can see in real time how each change affects the building, its loads and its cost.

The configurator is in beta and available by invitation only. Get in touch to learn more.

What our models do

Every part of a building has a cost. Some costs change smoothly as the design changes, and others jump in steps, such as one more row of footings, a bigger mechanical unit or an elevator.

Our models, usually built in parametric design software, measure those parts as the design changes and apply approximate rates. Comparing options then takes minutes instead of a redesign and a new estimate each time.

A cost consultant or contractor still prices the final design. The models narrow down which options are worth pricing.

On one project, early modelling identified more than $1 million in potential construction savings.

Where we have used it

Two colour-coded site plans of Cambrian Heights comparing cut and fill depths for different building positions
Cambrian Heights site model: cut and fill compared for different building positions.

Site placement on bedrock: Cambrian Heights, 2021

The 46,500 ft² building sits on a large, uneven site. The model priced bedrock blasting, fill, foundation walls, piers and retaining walls while we moved, raised and resized the building to find the cheapest option. The building is now under construction.

Colour-coded model of a three-storey building with a cost breakdown by component and a total building cost
Fluid costing study: each component is costed as the geometry changes.

Component costing: Fluid Costing study, 2021

A three-storey study model costed each component, from footings and envelope to ductwork, the elevator core and windows, as the geometry changed. It answers questions such as whether a taller floor height adds enough cost to matter.

Rule-based design: Carbon Canopy, 2019

For a timber addition threaded through existing buildings, a few client controls drive the whole design, down to fabrication outputs and material take-offs. See Carbon Canopy.

Preliminary site work: Chalmers and Kingsway

We are using the same site models on Chalmers (ongoing) and Kingsway to compare pad elevations, cut and fill, and access before the layout is fixed.

Common questions

When is a cost model worth doing?

When a few big decisions still open drive most of the cost, such as building position on a rocky site, storey heights, structural grid, size or phasing. It is most useful at concept and schematic design.

How accurate is it?

It is approximate. It shows which option costs more and roughly by how much. Final budgets come from a cost consultant or contractor.

Is it a separate service?

It can be part of our design work or a study on its own. Tell us the decision you're facing and we'll suggest the simplest model that answers it.