Armstrong Industrial
Sudbury, Ontario
Extensive renovations and new interventions were key aspects of this project, with the intent to maintain as much of the building’s original integrity as possible. Thorough renovations included new roof and wall cladding, additional windows, and interior layout modifications, while the new construction of a defined front entrance structure, loading bay addition, exterior loading ramp with foundation underpinning, and garbage enclosure were integrated into the existing project.

While these interventions were originally prepared for an unknown future tenant, the leasing of the space to Habitat for Humanity’s ReStore added interior fit-up work to the design scope. As a hub for the sustainable rehabilitation of existing goods, this renewed building will continue to reflect Habitat’s ethos for years to come.

PERIOD           2022 - 2024
STRUCTURE        Steel
SCALE            2 stories
FLOOR AREA       7,588 ft2

PHASE (1)(2)
CLIENT           Bloomington Developments
STRUCTURAL       Komri Engineering (1) & Shield Consulting Engineers (2)
MECHANICAL       Komri Engineering (1) & Shield Consulting Engineers (2)
ELECTRICAL       Komri Engineering (1) & Shield Consulting Engineers (2)
CIVIL            C2S Engineering (2)
GEOTECHNICAL     Englobe (2)

PHASE (3)
CLIENT (TENANT)  Habitat for Humanity
STRUCTURAL       Komri Engineering
MECHANICAL       Komri Engineering
ELECTRICAL       Komri Engineering 

SERVICES         Record Drawings
                 Minor Variance
                 Conceptual Design
                 Rendering Package
                 Building Permit
                 Tenant Fit-Up
                 Phased Work
                 Enhanced CA 