HEROLD INDUSTRIAL PARK
The industrial site lies at the intersection of the two largest highways in Northern Ontario. We are renovating the existing building on site and we are increasing the density of the property with an additional building intended for industrial tenants. The building will be a mass timber structure to help lower its embodied carbon while maintaining a durable and attractive finished quality.
Services:
Site Plan Approval
Building Permit
Conditional Permit
MTO + Conservation Authority Requirements
Phased Permit Submissions (Tenant Requirements)
LOCATION Sudbury, ON
PERIOD 2020.11 -
STRUCTURE Mass Timber (New) + Steel (Existing)
SCALE 2 stories (Both Buildings)
FLOOR AREA 18,800 ft2 (New) + 21,500 ft2 (Existing)
CLIENT Bloomington Developments
MASS TIMBER Nordic
STRUCTURAL Tall Pines Engineering
SITE STRUCTURAL Englobe
MECHANICAL SNC
ELECTRICAL SNC
CIVIL Tulloch Engineering
GEOTECHNICAL Terraprobe
CODE CHM
TENANT FIT-UP DAO - Makami - Nordic - SNC
(New Main Entrance, Envelope Windows / Doors, Additional Steel Second Floor, Stairs, Slab Modifications, Fire / Acoustic Separations, Bathrooms, Increased Occupant Load M&E)
TENANT FIT-UP JLR
(Remaining Interior Design, Partitions, Finishes, M&E, Equipment)
PERIOD 2020.11 -
STRUCTURE Mass Timber (New) + Steel (Existing)
SCALE 2 stories (Both Buildings)
FLOOR AREA 18,800 ft2 (New) + 21,500 ft2 (Existing)
CLIENT Bloomington Developments
MASS TIMBER Nordic
STRUCTURAL Tall Pines Engineering
SITE STRUCTURAL Englobe
MECHANICAL SNC
ELECTRICAL SNC
CIVIL Tulloch Engineering
GEOTECHNICAL Terraprobe
CODE CHM
TENANT FIT-UP DAO - Makami - Nordic - SNC
(New Main Entrance, Envelope Windows / Doors, Additional Steel Second Floor, Stairs, Slab Modifications, Fire / Acoustic Separations, Bathrooms, Increased Occupant Load M&E)
TENANT FIT-UP JLR
(Remaining Interior Design, Partitions, Finishes, M&E, Equipment)